Editorial note. This Case Note is a short, plain-English summary and our editorial opinion. It may not capture every issue in the case, may contain errors or become out of date, is not legal advice, and must not be relied upon. Always read the full judgment (linked below) and take advice from a qualified lawyer before acting.

Does the Building Safety Act 2022 stop service charges under qualifying leases for unsafe cladding whose defects pre-date the Act’s 30-year window? Yes, held the Court of Appeal on 17 November 2026 in Almacantar Centre Point Nominee No.1 Ltd and another v de Valk and others [2026] EWCA Civ 1466. In a joint judgment of Newey and Fancourt LJJ, with which Miles LJ agreed, the court dismissed the freeholders’ appeal (paras 1, 114–115). Leaseholders with “qualifying leases” at Centre Point House do not have to pay service charges for the proposed façade works (paras 5–7, 54, 112–114).

What the case was about

Centre Point House is part of the 1960s Centre Point development in central London. Above two-storey or double-height restaurant and retail units sits a six-storey podium of 36 duplex flats (para 2). Its experimental façade has let water in, and the timber framing has rotted (para 3). One opening window panel has already fallen off, and the experts considered the façade dangerous (para 72). The freeholders plan to remove much of the existing façade and fix a new steel-framed system over the retained timbers, at an expected total cost of more than £12 million including VAT and fees (paras 4, 73).

The First-tier Tribunal held that the works fell within the landlords’ repairing covenants, so a service charge was payable in principle. But it held that only leaseholders without “qualifying leases” would be liable, because paragraph 8 of Schedule 8 to the Act protects qualifying leaseholders (para 6). The Upper Tribunal dismissed the landlords’ appeal (para 7). Paragraph 8 provides that no service charge is payable under a qualifying lease “in respect of cladding remediation”: the removal or replacement of any part of a cladding system that forms the outer wall of an external wall system and is unsafe (para 21).

What the Court of Appeal decided

No “relevant defect” is needed. The neighbouring protections in Schedule 8 depend on a “relevant defect”, broadly one arising from works completed in the 30 years before 28 June 2022. Centre Point House pre-dates that period, so the works here do not remedy a relevant defect (paras 15, 28). The court held that paragraph 8 is not limited in that way (para 54). Unlike the neighbouring paragraphs, it does not mention relevant defects (para 41), and its requirement that the cladding be “unsafe” would seem unnecessary if it did, since a relevant defect must already cause a building safety risk (para 42). The introductory sections 116 and 122 do not cut down the Schedule (para 43). The court said the Act’s “bright lines” can produce results that look anomalous (para 45). Post-enactment explanatory notes may be persuasive but have no particular legal status, and those for paragraph 8 do not mention relevant defects (para 46). The court also noted, while treating it with caution, the Government’s January 2022 promise that no leaseholder living in their own flat would “pay a penny” to fix dangerous cladding (para 48). This was not a drafting error that the court could correct (para 53).

“Unsafe” is not limited to fire. The landlords argued that “unsafe” meant combustible, or dangerous because it contributes to the spread of fire (para 55). The court disagreed: it is an ordinary word meaning “involving danger”, and, as this case shows, cladding can cause harm other than through fire (paras 58–60).

Cladding, and its removal, were questions of fact. Whether the façade was a “cladding system”, and whether the works removed and replaced part of it, were questions of fact for the specialist tribunal, and the FTT made no error of law (paras 80, 83, 87, 89).

The “outer wall”. The FTT found that the cladding system was the outer part of a wider external wall system that included the dwarf walls behind it, so this was not a case where cladding and wall were one and the same (paras 95, 111–112). The court left open whether a system forming the entire external wall, such as modern curtain walling, can be a “cladding system” (para 110).

Why it matters

  • Older defects are covered. Paragraph 8 can bar service charges under a qualifying lease for removing or replacing unsafe cladding even where the defect pre-dates 28 June 1992 (paras 50, 54).
  • Danger of any kind counts. Cladding that is unsafe because it may fall, not just because it may burn, can fall within paragraph 8 (paras 59–60).
  • Non-qualifying leaseholders. The FTT held that the works were chargeable in principle and that leaseholders without qualifying leases would be liable (para 6).
  • An open question remains. Whether an entire external wall system, as in a modern curtain-walled building, can itself be a “cladding system” under paragraph 8 has been reserved for a future case (para 110).
  • In our view, landlords of older blocks with failing façades should not assume that the 30-year window protects their ability to recover cladding costs from qualifying leaseholders.
Research this on Search the Law

Free to search across 25 official UK databases — no account needed. Explore the authorities behind this case:

Read the full judgment: Almacantar Centre Point Nominee No.1 Ltd and another v de Valk and others [2026] EWCA Civ 1466 (The National Archives).